1.The static ring
gland shall have sufficient strength and tighten the screws, when installation mechanical seals to ensure its transverse
and vertical axis.
2.Seal line must be
unblocked;It is forbidden to dry friction.
3.Hydrostatic test,
observe whether there is a leak.
4.When using the
temperature over 80 ℃ forced circulation way
makes mechanical seal cooling should be adopted.
5.With handle
gently pressing ring after installation, should scale easily and have certain
elasticity;Manual jigger, should function properly.
6.Install the
mechanical seal of main shaft diameter should be 0.04 mm (0.06 mm) or less,
axial momentum is 0.3 mm or less, and processing according to the requirements
of graphic axis and static ring corresponding parts.
7.Boot
commissioning, pay attention to the presence of abnormal sound.
8.When
installation, it is forbidden to collision, brutal beatings, friction pair
surface should be absolutely clean.