Core tip: there are four main
kinds of machinery seal parts: A. Mainly seal:rotate ring and static ring. B.
The auxiliary seal: seal ring. C. Pressure: springs, ring. D. Drive parts :
play basket and key or fixed screw.
Mechanical seal work problems should be paid
attention:
1, The matters needing attention when you
install mechanical seals
A. Be very careful to avoid during the
installation of the installation of the deviation
(1) To tighten the gland should be performed
after coupling alignment, the bolt should be uniform, prevent gland face
skewed, with a feeler gauge to check each point, the error is not more than
0.05 mm.
(2) Check the fit clearance of gland with
shaft or sleeve diameter (namely) of concentricity, wants even all round, with
a feeler check each point tolerance is not more than 0.01 mm.
B. The spring compression quantity according
to provisions, there is no too big or too small, request error is 2.00 mm.Will
increase the end face specific pressure, and the other end surface wear.Starts
to cause low pressure than not sealing effect.
C. Ring but after installation to ensure can
flexible movement, the shaft will ring after pressure to the spring should be
able to bounce back automatically.
2, Note to remove the mechanical seal
A. Carefully when removing mechanical seal, it
is forbidden to use the hammer and flat, so as not to damage the sealing
element.To do a pair of steel wire hook, on a self-financing direction into the
driving seat gaps, pull the sealing device.If the scale removing not bottom,
should be cleaned before disassembly.
B. If on both ends of the pump mechanical
seal, in assembly, disassembly process to take care of each other, to prevent
the attend.
C. Mechanical seal, which had run for every
gland loose moves in the seal, the dynamic and static ring parts must be
replaced, should not be to tighten the continue to use again.
Mechanical seal normal operation and
maintenance issues:
1. Mechanical seal before the start of
preparation and the matters needing attention
A. Overhaul mechanical seal, and the accessory
devices and pipeline installation is complete, meets the technical
requirements.
B. Before starting the mechanical seal to
static pressure test, check whether there is mechanical seal leakage
phenomenon.If the leakage is more, should find out the reason to try to
eliminate.If still invalid, should remove check and reinstall.General hydrostatic
test pressure in 2 ~ 3 kg/cm2.
C. The pump rotate to turning, check whether
the light evenly.Such as turning demanding or not move, should check whether
assembly size error, installation is reasonable.
2. Mechanical seals installation and service
A. Before the start of sealed cavity filled
with liquid shall be maintained.For solidification of the medium, the
application of steam heat seal chamber to melt medium.Prior to start turning,
in order to prevent sudden start caused by the soft ring fracture.
B. To use WaiFeng oil pump system of
mechanical seal, should start the sealing oil system.Stop after the last stop
in sealing system.
C. Hot oil pump stop can't stop immediately
after sealing oil cavity and end face seal cooling water, should be end face
seal oil temperature has dropped below 80 degrees, can stop the cooling water,
so as not to damage the sealing parts.
3. The mechanical seal
A. After pump start-up if there is a slight
leakage phenomenon, should be observed for a period of time.Such as 4 hours of
continuous running, still don't reduce the leakage, should stop the pump to
check.
B. The operating pressure of the pump should
be smooth, the pressure fluctuation is not more than 1 kg/cm2.
C. Pump in operation, should avoid to occur,
in order to avoid damage in seal face dry friction and sealing.
D. Seal condition check regularly.In
operation, when the leak than standard, heavy oil is not more than 5 drops per
minute, light oil is not more than 10 / points, such as 2-3 days still no
improvement, you should stop the pump to check the sealing device.