A. The installation reactor seal
1. Check for installation of the
mechanical seal type, specification is correct.
2. Check the host that is associated
with the installation of the mechanical seal parts size accuracy and geometric
accuracy and mutual relationship meets the technical requirements.Basically has
the following several aspects:
1) The installation of mechanical
seal parts of the shaft radial runout tolerance (or collar), the surface finish
and outer diameter of the shaft (or bush) size tolerance.
2) Seal cavity and gland with a shaft
positioning end facing (or bush) the center line of the vertical degree of
tolerance.
3) The installation ring seal end of
the shaft (or collar), the installation of mechanical seal shell hole end
chamfering of structure and finish.
4) The mechanical seal rotor axial
displacement at work.
3. In the process of the installation
of mechanical seal, should maintain clean, tapping sealing element, and are not
allowed to use tools to prevent injuries and damage.
4. When installation, dynamic and
static ring surface should be coated with a layer of clean oil and turbine oil.Auxiliary
seal ring (including ring sealing ring and static ring sealing ring) before
installation also need to apply a layer of clean oil or turbine oil, to ensure
the installation smoothly.
5. The static ring seal trap after
static ring back, in sealed inside the end cover, should pay attention to not
hurt the static ring end face, to ensure the static ring end face perpendicular
to the center line of the end cover, and pay attention to the static ring back
anti-rotating slot to stop pin, but can't contact.
6. The mechanical seal rotating part,
rely on the spring seat of two fixed screw on the shaft, tighten the set screw,
to ensure the working length of spring.
B. The use of reactor seal:
1. The host before starting, need to
check the attached mechanical seal device, cooling and lubrication system is
perfect.
2. Pipe should be cleaned before
starting materials to prevent rust impurities into the sealed cavity.
3. With the hand disc coupling, check
whether shaft rotate easily, if the dish is very heavy, need to check the
installation dimensions are correct.
4. Normal before driving, need a
static pressure test, check the mechanical seal face, sealing ring and the
sealing effect of sealing end cover, if any problem, check to solve them one by
one.
5. The host before starting, we
should keep the sealed cavity filled with fluid or sealed by the media, have
separate seal system shall be starting, such as cooling water system should
also come into circulation.
6. Normal before use, first to
atmospheric pressure, observe whether the rise of temperature of the sealing
parts is normal, ever leak phenomenon.If there is a slight leakage, can run one
period of time, the transverse joint more evenly, until leakage was gradually
reduced to normal.1-3 hours, such as operation still don't reduce leakage, need
to stop it for checking.
7. Working condition of normal
operation, the booster heating can slowly, respectively, and pay attention to
the temperature rise of end face and the leakage situation, if everything is
normal, that can be used in production.